Overall Trends
Total, fatal, and serious accidents in the selected range.
Search investigations, review source evidence, monitor watched reports, and trace long-term patterns from one calm, data-first workspace.
Fast key and full-text search with live filters, watches, and precise metadata.
Use quotes for exact phrase matches (for example "fuel selector valve").
Track fatal and non-fatal accident patterns across Part 91, Part 135, and Part 121 operations.
Major cases, deep-report coverage, and investigation media across decades of NTSB history.
Move quickly by aircraft, airport, operator, and time with indexes built for research, not wandering.
NTSB Reports is an independent research and search tool for public aviation accident and incident records. It brings NTSB aviation reports, structured fields, docket files, extracted figures, photos, videos, and update history into one searchable interface.
The goal is practical safety education: make it faster to find relevant investigations, compare similar events, review factual records, and understand the evidence behind probable-cause and preliminary reports.
The investigative work and source records belong to the National Transportation Safety Board and the published investigation record. This site is not affiliated with or endorsed by the NTSB.
Chicago, IL
CONDOR FLT 610 (MCDONNELL DOUGLAS DC-10, GERMAN REGISTRATION: DADSO) WAS APRX 2 HRS LATE AS THE FLT CREW MEMBERS WERE PREPARING TO TAKEOFF. SUBSEQUENTLY, FLT 610 WAS CLRD FOR TAKEOFF WITH INSTRUCTIONS TO CROSS THE 5 DME (ON THE STANDARD INSTRUMENT DEPARTURE/SID) AT OR ABOVE 3000 FT. THE TAKEOFF CLNC WAS THEN CANCELED, BUT WAS REISSUED ABOUT 1 MIN LATER WITH THE SAME RESTRICTIONS. AT ABT THAT TIME, THE FLT WAS EXACTLY 2 HRS OVERDUE & THE COMPUTER DROPPED THE FLT PLAN DATATAG & BLOCK (AS PROGRAMMED TO HANDLE OVERDUE/UNUSED FLT PLANS). AFTER TAKEOFF, FLT 610 CONTACTED DEPARTURE CTL. THE CTLR NOTED ONLY A PRIMARY TRANSPONDER TARGET & OBSERVED NO ALT DATA. MEANWHILE, PIPER PA-42, N900MP, WAS ON AN IFR ARRIVAL FOR A VISUAL APCH TO PAL-WAUKEE ARPT AT 2800 FT. SUBSEQUENTLY, THE TWO ACFT CONVERGED & PASSED WITH ABOUT 2 MI (HORIZONTAL) & 200 FT (VERTICAL) SEPN. INTERVIEWS WITH THE CTLRS REVEALED THEY HAD INTENDED FLT 610 TO CLIMB TO 5000 FT AS PROVIDED BY THE SID. THE ERROR WAS NOT NOTED (WITH THE DATA TAG DROPPED FROM THE COMPUTER).
CONDOR FLT 610 (MCDONNELL DOUGLAS DC-10, GERMAN REGISTRATION: DADSO) WAS APRX 2 HRS LATE AS THE FLT CREW MEMBERS WERE PREPARING TO TAKEOFF. SUBSEQUENTLY, FLT 610 WAS CLRD FOR TAKEOFF WITH INSTRUCTIONS TO CROSS THE 5 DME (ON THE STANDARD INSTRUMENT DEPARTURE/SID) AT OR ABOVE 3000 FT. THE TAKEOFF CLNC WAS THEN CANCELED, BUT WAS REISSUED ABOUT 1 MIN LATER WITH THE SAME RESTRICTIONS. AT ABT THAT TIME, THE FLT WAS EXACTLY 2 HRS OVERDUE & THE COMPUTER DROPPED THE FLT PLAN DATATAG & BLOCK (AS PROGRAMMED TO HANDLE OVERDUE/UNUSED FLT PLANS). AFTER TAKEOFF, FLT 610 CONTACTED DEPARTURE CTL. THE CTLR NOTED ONLY A PRIMARY TRANSPONDER TARGET & OBSERVED NO ALT DATA. MEANWHILE, PIPER PA-42, N900MP, WAS ON AN IFR ARRIVAL FOR A VISUAL APCH TO PAL-WAUKEE ARPT AT 2800 FT. SUBSEQUENTLY, THE TWO ACFT CONVERGED & PASSED WITH ABOUT 2 MI (HORIZONTAL) & 200 FT (VERTICAL) SEPN. INTERVIEWS WITH THE CTLRS REVEALED THEY HAD INTENDED FLT 610 TO CLIMB TO 5000 FT AS PROVIDED BY THE SID. THE ERROR WAS NOT NOTED (WITH THE DATA TAG DROPPED FROM THE COMPUTER).