Overall Trends
Total, fatal, and serious accidents in the selected range.
Search investigations, review source evidence, monitor watched reports, and trace long-term patterns from one calm, data-first workspace.
Fast key and full-text search with live filters, watches, and precise metadata.
Use quotes for exact phrase matches (for example "fuel selector valve").
Track fatal and non-fatal accident patterns across Part 91, Part 135, and Part 121 operations.
Major cases, deep-report coverage, and investigation media across decades of NTSB history.
Move quickly by aircraft, airport, operator, and time with indexes built for research, not wandering.
NTSB Reports is an independent research and search tool for public aviation accident and incident records. It brings NTSB aviation reports, structured fields, docket files, extracted figures, photos, videos, and update history into one searchable interface.
The goal is practical safety education: make it faster to find relevant investigations, compare similar events, review factual records, and understand the evidence behind probable-cause and preliminary reports.
The investigative work and source records belong to the National Transportation Safety Board and the published investigation record. This site is not affiliated with or endorsed by the NTSB.
Lincoln, NE
FLARE FOR TOUCHDOWN ENDED SHORT OF THE ACTIVE RWY AT LINCOLN, NEBRASKA. THE PIC RPTD WINDSHEAR ON FINAL BUT WIND CONDITIONS WERE RPTD AS BEING 340 DEGREES AT 15 KTS, A HEADWIND FOR THIS LANDING. NO MECHANICAL CONTROL PBLM WAS REPORTEDLY EXPERIENCED DURING THIS SEQUENCE AND NO THUNDERSTORM ACTIVITY WAS PRESENT. THE RWY LENGTH FOR RWY 35R WAS 5500 FEET, WELL WITHIN THE CAPABILITY OF THIS ACFT. THERE WERE NO RPTS FM ANY OTHER ACFT EXPERIENCING A SIMILAR DIFFICULTY.
FLARE FOR TOUCHDOWN ENDED SHORT OF THE ACTIVE RWY AT LINCOLN, NEBRASKA. THE PIC RPTD WINDSHEAR ON FINAL BUT WIND CONDITIONS WERE RPTD AS BEING 340 DEGREES AT 15 KTS, A HEADWIND FOR THIS LANDING. NO MECHANICAL CONTROL PBLM WAS REPORTEDLY EXPERIENCED DURING THIS SEQUENCE AND NO THUNDERSTORM ACTIVITY WAS PRESENT. THE RWY LENGTH FOR RWY 35R WAS 5500 FEET, WELL WITHIN THE CAPABILITY OF THIS ACFT. THERE WERE NO RPTS FM ANY OTHER ACFT EXPERIENCING A SIMILAR DIFFICULTY.